Pharmacy Drug Dispensing Fee Survey Services
Document #:  JFSR1011078047


Question:   Re Section 3.1 Scope of Work and Specification of Deliverables: Section B. Distribution of Survey (pg 22) Regarding the statement “Vendors must, at minimum, ascertain the appropriate response rate of at least a 95% confidence interval” Is there a margin of error that you want obtained on the results associated with the 95% confidence level? Re Section 1.8 Time Frames & Funding Source(pg 23) The time frame for Phase II distribution of survey (four weeks) does not lend itself to multiple survey mailings. Sound survey methodology includes a second planned mailing to non-respondents after a waiting period for collection of surveys form the first mailing (see Dillman, mail and Internet Surveys, 2nd Edition, 2000). After the second mailing, additional time is required for return of those surveys. Will it be possible to adjust the project schedule to allow additional time for phase II? Re Section 5.2 Section C Cost Proposal (pg 19) Is there a cost limit associated with this RFP? If so, what is it?

Answer:   1) No. ODJFS would expect the vendor to report the sampling margin of error. The previous two surveys have had an error rate of 5.8% and 6.5%. 2) Phase II can be extended into Phase III if needed. However, Phase III must be completed as scheduled by Week 12 and Phase IV must be completed as scheduled by Week 15. 3) ODJFS does not provide information on any budget limits. The vendors are to assess their actual costs based on the work described for the project and submit their cost proposal accordingly.

Date: 4/19/2010

Inquiry: 19999


Question:   Re: RFP Section III/3.1/A. Survey Development (pages 7-8 of 23). Questions: - Will a cover letter be sent with the survey? - Who develops the cover letter content - Ohio or the supplier?

Answer:   Yes, a cover letter will be sent with the survey. ODJFS will develop the content of the cover letter with assistance from the selected vendor. The selected vendor's assistance will be limited to reviewing the cover letter for accuracy concerning dates, process for survey submission and contact information.

Date: 4/19/2010

Inquiry: 20021


Question:   Re: RFP Section III/3.1/B. Distribution of Survey (page 8 of 23). Question: If the State is providing a database for the survey mailings, please confirm what information is included – e.g., mailing addresses, e mail addresses, phone numbers, etc.

Answer:   Only mailing addresses will be included on the excel spreadsheet. No email or phone numbers will be included in this file.

Date: 4/19/2010

Inquiry: 20020


Question:   Re: RFP Section III/3.1/B. Distribution of Survey (page 8 of 23): “ODJFS will supply mailing labels.” Question: For survey mailings, will Ohio provide printed mailing labels, database or both?

Answer:   ODJFS will provide an excel file that contains mailing information for the providers.

Date: 4/19/2010

Inquiry: 20019


Question:   Re: RFP Section III/3.1/B. Distribution of Survey (page 8 of 23): “ODJFS will supply mailing labels.” Question: For survey mailings, will Ohio provide actual mailing labels or a database? (The reason we ask is, if they are actual labels, additional costs for data entry would be required, increasing the overall cost.)

Answer:   ODJFS will provide an excel file that contains mailing information for the providers.

Date: 4/19/2010

Inquiry: 20018


Question:   I am resubmitting my previous questions in case they were not received when first submitted on April 12. Question 1. RE: RFP Pg 22. Section 3.1 Scope of Work and Specification of Deliverables: Section B. Distribution of Survey. Regarding the statement “Vendors must, at minimum, ascertain the appropriate response rate of at least a 95% confidence interval” Is there a margin of error that you want obtained on the results associated with the 95% confidence level? Question 2. RE: RFP Pg 23. Section 1.8 Time Frames & Funding Source. The time frame for Phase II distribution of survey (four weeks) does not lend itself to multiple survey mailings. Sound survey methodology includes a second planned mailing to non-respondents after a waiting period for collection of surveys form the first mailing (see Dillman, mail and Internet Surveys, 2nd Edition, 2000). After the second mailing, additional time is required for return of those surveys. Will it be possible to adjust the project schedule to allow additional time for phase II? Question 3. RE: RFP Pg 19. Section 5.2 Section C Cost Proposal. Is there a cost limit associated with this RFP? If so, what is it? Thank you Sara Lichtin Boyd Voinovich School of Leadership and Public Affairs Ohio University Athens, OH 45701 740-707-7794 Boyds1@ohio.edu

Answer:   1) No. ODJFS would expect the vendor to report the sampling margin of error. The previous two surveys have had an error rate of 5.8% and 6.5%. 2) Phase II can be extended into Phase III if needed. However, Phase III must be completed as scheduled by Week 12 and Phase IV must be completed as scheduled by Week 15. 3) ODJFS does not provide information on any budget limits. The vendors are to assess their actual costs based on the work described for the project and submit their cost proposal accordingly.

Date: 4/19/2010

Inquiry: 20015


Question:   Re Section 3.1 Scope of Work and Specification of Deliverables: Section B. Distribution of Survey (pg 22) Regarding the statement “Vendors must, at minimum, ascertain the appropriate response rate of at least a 95% confidence interval” Is there a margin of error that you want obtained on the results associated with the 95% confidence level? Re Section 1.8 Time Frames & Funding Source(pg 23) The time frame for Phase II distribution of survey (four weeks) does not lend itself to multiple survey mailings. Sound survey methodology includes a second planned mailing to non-respondents after a waiting period for collection of surveys form the first mailing (see Dillman, mail and Internet Surveys, 2nd Edition, 2000). After the second mailing, additional time is required for return of those surveys. Will it be possible to adjust the project schedule to allow additional time for phase II? Re Section 5.2 Section C Cost Proposal (pg 19) Is there a cost limit associated with this RFP? If so, what is it?

Answer:   1) No. ODJFS would expect the vendor to report the sampling margin of error. The previous two surveys have had an error rate of 5.8% and 6.5%. 2) Phase II can be extended into Phase III if needed. However, Phase III must be completed as scheduled by Week 12 and Phase IV must be completed as scheduled by Week 15. 3) ODJFS does not provide information on any budget limits. The vendors are to assess their actual costs based on the work described for the project and submit their cost proposal accordingly.

Date: 4/19/2010

Inquiry: 19998