Document #:  0A1265


Question:   Section 4.2.3 describes the InnovateOhio objectives. Please describe to what extent this engagement needs to integrate with a central InnovateOhio platform, including DataOhio, and the expectations for each of the components listed.

Answer:   An answer to this cannot be provided at this time and will be discussed with the Contractor, if an award is made.

Date: 3/12/2021

Inquiry: 83159


Question:   Would you share any user research that informed the UX and information architecture of user interfaces shown in the Vision document?

Answer:   An answer to this cannot be provided at this time and will be discussed with the Contractor, if an award is made.

Date: 3/12/2021

Inquiry: 83157


Question:   How is accessibility conformance currently tested and verified?

Answer:   An answer to this cannot be provided at this time and will be discussed with the Contractor, if an award is made.

Date: 3/12/2021

Inquiry: 83154


Question:   With regard to "ADA compliance," what is the expected conformance level of the dashboard, One Plan, and CCFA user interfaces? Typical compliance is to WCAG 2.1 AA, is this appropriate?

Answer:   An answer to this cannot be provided at this time and will be discussed with the Contractor, if an award is made.

Date: 3/12/2021

Inquiry: 83153


Question:   Regarding, Attachment 9, second paragraph, how does the State want proposers to handle addresses and locations when services will be performed remotely on a “work from home” basis?

Answer:   If “work from home” is temporary due to the pandemic, please provide the site where they would normally report for work. The work from home location is still subject to the “Prohibition of the Expenditure of Public Funds for Offshore Services” RFP Section.

Date: 3/9/2021

Inquiry: 83160


Question:   In the 2018 ED Steps procurement, ODE had identified two vendors that were precluded from bidding on the opportunity due to their involvement in authoring the technical architecture document and being involved with the agency prior to the procurement. Are those vendors still precluded from bidding on this opportunity?

Answer:   Vertex Computer Systems, Inc. and DevCare Solutions assisted with the development of materials released as part of this RFP. An amendment will be released to confirm their exclusion from responding to this RFP.

Date: 3/4/2021

Inquiry: 83101


Question:   Has ODE worked with any vendors to help develop the ED Steps program, including technical architecture, program design, or other activities related to the ED Steps program? If so, could you please name those vendors?

Answer:   Vertex Computer Systems, Inc. and DevCare Solutions assisted with the development of materials released as part of this RFP. An amendment will be released to confirm their exclusion from responding to this RFP.

Date: 3/4/2021

Inquiry: 83102


Question:   In 2018, ODE released an RFP for the ED Steps system. What are the major changes that have occurred between that RFP and this new RFP? What led to the cancellation?

Answer:   The State has released the current RFP as a new solicitation and does not compare it to the previous iteration which was cancelled in order to re-release with revisions.

Date: 3/4/2021

Inquiry: 83100


Question:   Can you share any findings or feedback from the in-progress One Needs Assessment pilot that may help inform our response to the RFP?

Answer:   Feedback is available on the ED STEPS website. This includes a testimonial video, FAQs and other resources to help guide and inform key stakeholders.

Date: 3/3/2021

Inquiry: 83158


Question:   Can the ODE clarify which provided example project they are referring to in relation to Supplement 1 (Ref. page 39, Supplement 1 Response, Bullet 4)?

Answer:   Page 39 (of 49) of the Supplement 1 , Scope of Work document is the responsibilities and qualifications for the Cloud .NET Developers. The State was unable to find a project being referred to in Bullet 4.

Date: 3/3/2021

Inquiry: 83156


Question:   For the required electronic proposal copy, can the ODE confirm that it would be acceptable to deliver a searchable PDF inclusive of all Technical Proposal items 1-20 in addition to the unaltered (except for vendor responses) word versions of Supplements 1-3, along with the required pricing excel file for Item 21?

Answer:   An electronic copy of everything submitted as the Technical Proposal must be included along with the Technical Proposal. Separately sealed along with the Cost Proposal, must be an electronic copy of everything submitted as the Cost Proposal.

Date: 3/3/2021

Inquiry: 83155


Question:   Is the CCIP considered the source-of-truth for all of its data domains or does it rely on master data externally (e.g. users, school districts/buildings, etc.)?

Answer:   Data related to planning, funding and payment processing is stored locally at CCIP and should be considered the source of truth. However, some other data elements such as origination and person information are sourced from another system called OEDS.

Date: 3/3/2021

Inquiry: 83152


Question:   Because the number of available services in the Azure Gov Cloud is fewer than those offered in the commercial cloud, can you provide a list of approved Azure functions/components or direct us to a list for review?

Answer:   ODE is currently using the following Azure components/services:
1. Application Gateway
2. App Service Plan (Currently using Windows version, exploring Linux based App Service Plan)
3. Azure Functions (both consumption based as well as functions on App Service Plan)
4. Service Fabric
5. Redis Cache
6. Key Vault
7. SQL Database
8. Cosmos DB
9. Service Bus
10. Blob Storage
11. Table Storage

Date: 3/3/2021

Inquiry: 83151


Question:   Can the ODE confirm that the only sections of Supplement 1 requiring a response are those listed in the Scored Requirements table on page 17 of the solicitation?

Answer:   The offeror must demonstrate a complete and coherent solution to Supplement 1 pertaining to the Project and not only sections listed in the Scored Requirements table. The State may reject incomplete Proposals.

Date: 3/3/2021

Inquiry: 83150


Question:   In section 1, it states that CCIP, the current platform stores information on key federal education laws. Where is this stored, how is it updated?

Answer:   Applicable federal and state education laws are identified using the US Department of Education's website as per Elementary and Secondary Education Act (ESEA). Guidance on federal and state education laws are housed within the CCIP document library. Documents and guidance are updated by office leadership within the Ohio Department of Education.

Date: 3/3/2021

Inquiry: 83149


Question:   We are considering a delivery strategy that includes a partner of ours that would utilize a near-shore development center. Their US operations are in Cincinnati. The development center is located in Columbia (South America). No data would be transferred or stored outside of ODE’s environment. Would ODE consider issuing a waiver to accommodate this arrangement for the Ed Steps project?

Answer:   The State would prefer the work to be performed in the United States. The State cannot guarantee approval ahead of the proposal and until its review has been completed.

Date: 3/3/2021

Inquiry: 83123


Question:   We are excited about the opportunity to present our proposal for the ED STEPS RFP. After conducting our review of the RFP materials, we request the RFP opening date be extended three weeks, from March 17, 2021, to April 7, 2021. An extension will allow CapTech--and all other vendors--sufficient time to develop compelling and competitive proposals. Please let us know if you can accommodate this request.

Answer:   Unfortunately, due to the urgency of having a Contractor on board as soon as possible, the State will not extend the Opening Date past March 17, 2021 at this time.

Date: 2/25/2021

Inquiry: 83089