Question:   The solicitation refers to an Independent Contractor Acknowledgement. Please clarify what the State is looking for with this requirement, and is there a template?

Answer:   Unless the Offeror is a “business entity” as that term is defined in ORC. 145.037 (“an entity with five or more employees that is a corporation, association, firm, limited liability company, partnership, sole proprietorship, or other entity engaged in business”), the Offeror must complete and submit an originally signed Independent Contractor Acknowledgement form in its entirety. https://www.opers.org/forms-archive/PEDACKN.pdf If the offeror is a business entity, they must merely provide for that in the cover letter.

Date: 12/18/2020

Inquiry: 82599


Question:   1. Section 4.3, RFP, Evaluation Scoring Formula, P. 13 of 44 text: MBE Set-aside = 5%. Total Points = Technical Proposal Points + Cost Proposal Points. Question: Within the Technical Proposal Points, Cost proposal points and the Total Points. MBE points are not reflected within the scoring formulas. Will MBE Set-aside not be calculated in the total points? 2. Section 1.3, Supplement 1, Solution Requested, p. 5 of 34 text: Software Licenses. The Offeror must provide or arrange for perpetual software licenses for all Commercial Software necessary to meet the requirements of this RFP. Question: Many companies are offering Term licensing. Will the State accept Term (subscription) based licenses? 3. Section 1.3.2, Supplement 3, System Security Plan, p. 9 of 31 text: A completed System Security Plan must be provided by the Contractor to the State and the primary point of contact from the Office of Information Security and Privacy no later than the end of the project development phase of the System Development Life Cycle (SDLC). Question: The embedded Ohio Security Plan Template.docx is an image. Please provide the actual document. 4. Section 2.1.2, Supplement 1, Backup and Recovery, p. 15 of 34 text: Include a backup and recovery and remote site disaster recovery strategy in your proposal that protects all data and programs related to this warehouse solution. Include hardware, software, storage, tape library, if appropriate. Question: Would the State be interested in a cloud-based disaster recovery system? 5. Section 2.1.2, Supplement 1, Back and Recovery, p. 15 of 34 text: Note: The state also offers disaster recovery for On-Premise distributed systems. Question: Does this site (or recovery center) have VMware vSphere ESXI Virtualized Environment available for use as an interim DR site? 6. Section 2.2, RFP, Proposal Submittal, p. 8 of 44 text: under Technical Proposal Requirements ‘Subcontractor Letters” Question: Please elaborate on what this document needs to entail? 7. Supplement 3, Overview and Scope, General Question: In order to accurately answer questions within supplement 3, is it sufficient to limit our answers to an on-prem environment only and for any employees working directly on the on-prem contract? 8. Section 2.2, RFP, Proposal Submittal, p. 7 of 44 text: Offeror responses to questions throughout this RFP and related Supplements should use a consistent contrasting color (blue is suggested to contrast with the black text of this RFP document) to provide their response to each requirement so that the Offeror response is readily distinguishable to the State. Question: Is it acceptable to use a dark blue text, shading, or italics for ease in readability?

Answer:   Please see Data Warehouse Answers.

Date: 12/15/2020

Inquiry: 82519


Question:   Is the Town currently working with a partner to support the Exchange 2013 and SharePoint 2013 infrastructure? Is the preference to upgrade current Teradata, Cognos, SPSS environment? Or is the preference to replace existing DW integration software and hardware with cloud native solution such as Azure SQL by September 2021? Since ODT legacy DWH environment and its infrastructure will retire by September 2021, is it expected that only a 1-time data migration is needed to new DW? Is it safe to assume no integration is expected with the legacy DWH environment after cutover to new DW in September 2021? Will an action to migrate IBM SPSS to Azure Machine Learning tools be considered for 2021 migration? Will an action to migrate reporting from Cognos to cloud native visualization tools such as Power BI be considered for 2021 migration? Is it acceptable to replace existing integration software (Teradata’s Tools and Utilities) with Azure ETL resources such as Azure Data Factory and Databricks? Is ODT open to retiring current Data Conversion and Migration Services in 2021? This will retire existing ETL infrastructure in 2021 and re-create ODT’s existing ETL processes on Azure?

Answer:   Data Warehouse RFP - Questions from Potential Vendors Received Thursday, December 10th, 2020 1. Is the Town currently working with a partner to support the Exchange 2013 and SharePoint 2013 infrastructure? a. Not applicable to the Ohio Department of Taxation (Taxation). 2. Is the preference to upgrade current Teradata, Cognos, SPSS environment? a. Taxation wants the most cost-efficient solution that provides, at a minimum, the current DWH’s functionality, security, and performance. 3. Or is the preference to replace existing DW integration software and hardware with cloud native solution such as Azure SQL by September 2021? a. See response to #2 above. 4. Since ODT legacy DWH environment and its infrastructure will retire by September 2021, is it expected that only a 1-time data migration is needed to new DW? a. Yes, there should be only one data migration for non-production and one for production. But existing daily/weekly/yearly ETL processes will also need to be replaced. 5. Is it safe to assume no integration is expected with the legacy DWH environment after cutover to new DW in September 2021? a. Correct, if a replacement solution is chosen, the existing DWH will be physically removed from the site. The existing DWH will be gone, but all the integrations the current DWH has in place with the tax systems should be incorporated into the new solution. 6. Will an action to migrate IBM SPSS to Azure Machine Learning tools be considered for 2021 migration? a. Taxation will consider all proposals that meet the RFP’s functional, performance and security requirements and can be implemented in the project’s time frame at the most cost-effective manner. Include in any replacement solution are the plans and cost to replace the entire environment and retain all technical and business staff/users. 7. Will an action to migrate reporting from Cognos to cloud native visualization tools such as Power BI be considered for 2021 migration? a. Taxation will consider all proposals that meet the RFP’s functional, performance and security requirements and can be implemented in the project’s time frame at the most cost-effective manner. Include in any replacement solution are the plans and cost to replace the entire environment and retain all technical and business staff/users. 8. Is it acceptable to replace existing integration software (Teradata's Tools and Utilities) with Azure ETL resources such as Azure Data Factory and Databricks? a. Taxation will consider all proposals that meet the RFP’s functional, performance and security requirements and can be implemented in the project’s time frame at the most cost-effective manner. Include in any replacement solution are the plans and cost to replace the entire environment and retain all technical and business staff/users. 9. Is ODT open to retiring current Data Conversion and Migration Services in 2021? This will retire existing ETL infrastructure in 2021 and re-create ODT's existing ETL processes on Azure? a. Taxation will consider all proposals that meet the RFP’s functional, performance and security requirements and can be implemented in the project’s time frame at the most cost-effective manner. Include in any replacement solution are the plans and cost to replace the entire environment and retain all technical and business staff/users.

Date: 12/15/2020

Inquiry: 82517


Question:   Would DOT be open to a proposal that would move the tax data warehouse to a cloud solution vs. an on-prem solution?

Answer:   Hi, I was advised they would not be interested in this option. Thanks