Question:   Attachment D: ODJFS FY2014 Wiring Bid Template. Could you clarify the C5e cable and 4 post rack descriptions between Scenario A and C? C5e standard or 350mhz? plenum in each scenario? 4 post rack - adjustable or basic?

Answer:   Scenario C Install and test in accordance with Attachment E, 100 duplex CAT5e cable runs (average length of 200 feet) terminating in hard wall office and/or modular furniture in new MDF into a new 4 post rack and 5- 48 port patch panels. Racks must be bonded and grounded in accordance with ANSI/EIA/TIA 607 standard and local building codes. To be provided by the vendor: 100 duplex CAT5e cable runs(Approximately, 200 feet in length, for a total of 40,000 feet) 1 - 4 post adjustable rack 1- 10 feet 6 gauge grounding wire 5 48 port CAT5E patch panels 100 - 5 foot patch cords 100 - 7 foot patch cords. This scenario should be based on a total labor charge of 80 Man Hours; 2 installers @ 40 hours each.

Date: 5/21/2013

Inquiry: 28750


Question:   I have 2 questions: 1. Scenarios A & B each calls for one hour labor. Scenario C calls for 80 hrs. Does this means that in Tab I "Cost Proposal Form", when calculating labor cost, it should be the cost for 82 hours? 2. In the past, the RFQ has required the "Declaration Regarding Material Assistance to a Terrorist Organization" for the State of Ohio Department of Public Safety. I did not see it in this RBL. Is it still required. If yes, in which Tab it needs to be included?

Answer:   1. Yes, 82 hours. 2. This Declaration Regarding Material Assistance to a Terrorist Organization (DMA) form is no longer a required form and was purposely omitted from the RLB.